Berau pedestrian zone project is part of the road improvement project. Here we will discuss the project.
Berau is one of the districts in East Kalimantan. The road improvement project in Berau has been started since 2013. The project aims to improve road conditions for the better.
Roads are infrastructure that is the main support in logistics and community needs distribution. If the road infrastructure is good, the logistics distribution will be faster and smoother. So we hope the price of needs will be lower and can improve the economy of the community.
The road improvement project consists of main road repairs, construction of sidewalks and road drainage channels. The sidewalk is built on the side of the road and above the drainage canal.
Berau Pedestrian Zone Project in 2018
1.APT Pranoto-SA Maulana Street
The sidewalk on APT Pranoto Street, Berau Regency uses drainage components consisting of manhole covers and drainage inlet. Manhole covers serve to close the drainage hole in the middle of the sidewalk. While the drainage inlet serves to close the channel hole on the edge of the road directly adjacent to the edge of the sidewalk.
In addition to drainage components, this sidewalk also uses cast iron ornaments with turtle motifs. They use these ornaments on lamp posts as decoration.
2. Milono Street
Then on the Milono Street project uses square cast iron manhole covers with a size of 670x670x50 mm and drainage inlet with a size of 500x400x50 mm. Manhole covers use on the sidewalk area. While the drainage inlet uses on the edge of the street.
Pedestrian zone at Milono Street also uses street furniture like benches, lamp posts, bollard, and tree grill. The sidewalk use LIBRA garden benches that are 150 cm long and from cast iron and teak wood. These benches are provided for pedestrians to be able to sit and rest for a while.
The lamp posts function to lighting the highway at night so that people can see the road conditions well. Besides that a bright road condition can prevent crime.
3. Durian 2-3 Street
While Berau pedestrian zone project in Durian 2-3 street uses drainage components consist of 860x800x60 mm cast iron manhole covers with the capacity of 12 tons, 670x670x50 mm cast iron manhole covers and 400x300x30 mm drainage inlet.
Customize Design Manhole Covers
Berau road project always uses cast iron manhole covers that we design custom. The custom design of manhole cover is in the form of a logo picture and the writing of the project name on the surface of the manhole cover. Pictures and logos serve as decorations so that the design of manhole cover is more beautiful and different from the other.
Benefits of building sidewalks
The construction of the sidewalk aims to separate the pedestrian path from the main road so that the pedestrians are more comfortable and safe. While the drainage channel serves to drain rainwater on the main road so that there is no waterlogging.